OTHERS CONTRACT NO. BHB-5/10/2016 THE SUPPLY OF STEVEDORING SERVICES TO BINTULU PORT SDN. BHD.
7
December
2016
Type |
Announcement |
Subject |
OTHERS |
Description |
CONTRACT NO. BHB-5/10/2016 THE SUPPLY OF STEVEDORING SERVICES TO BINTULU PORT SDN. BHD. |
Bintulu Port Sdn. Bhd. ("BPSB" or "the Company") a wholly-owned subsidiary of Bintulu Port Holdings Berhad ("BHB") has issued the Letter of Acceptance Ref: (112)BHB(BPSB)/21.5/39 dated 6 December 2016 to Blessed General Contractor Sdn. Bhd., Lot 3364, No. 78, 1st Floor Parkcity Commerce Square, Phase 1, Jalan Tun Ahmad Zaidi, P.O Box 2777 Bintulu, 97000 Bintulu for the above contract based inter alia on the following terms and conditions:-
1. SCOPE OF CONTRACT
The Supply of Stevedoring Services to Bintulu Port Sdn. Bhd.
2. CONTRACT SUM
The Contract Sum is for Ringgit Malaysia: Fourteen Million One Hundred Ninety Five Thousand Six Hundred Forty Two and Sen Eighteen (RM14,195,642.18) only (including 6% GST).
3. DURATION OF CONTRACT
The duration of this contract shall be Thirty Six Months (36) Months from the date of Notice to Commence Services.
4. PENALTY
That the Superintending Officer reserves the right to deduct an amount from the monthly payment for services which in his sole opinion is not satisfactorily completed or for services not done as follows:-
1. Penalty For Non-Performance (General Cargo Operations)
Item No. |
Works |
Period |
a. |
Failure to supply completely the requested gang to a vessel (inclusive of equipment operators and gang) |
RM6,000.00 per vessel/shift
|
b. |
Failure to supply adequate gang as requested to a vessel (inclusive of equipment operators and gang)
|
RM2,400.00 per gang/shift |
c. |
Gang refuse to work or resume work |
RM1,200.00 per gang/shift |
d. |
Failure to supply adequate number of the following manpower in a gang/shift:- |
i. Stevedores
|
RM 50.00 per man gang/shift
|
ii. Equipment Operator/Rigger |
RM 65.00 per man gang/shift |
e. |
Equipment Operators/Rigger refuse to work. |
RM100.00 per man gang/shift
|
f. |
Failure to clean the lavatories satisfactorily |
RM100.00 per occasion/shift |
g. |
Leaving place of work early and or starting work late from the specified shift time/operation time. |
RM300.00 per gang/shift |
h. |
Equipment Operator leaving place of work or late from the specified shift time/operation time |
RM65.00 per man gang/shift |
i. |
Failure to wear PPE and Uniform |
RM30 per man gang/shift |
2. Penalty For Non-Performance (Base Support Services)
Item No. |
Works |
Period |
a. |
Failure to supply Foreman as required
|
RM60 (normal hour)
RM90 (normal overtime)
RM120 (Sunday overtime)
RM180 (Public Holiday overtime)
per manhour
|
b. |
Failure to supply Equipment Operator or Stevedore as required |
RM25 (normal hour)
RM37.50 (normal overtime)
RM50 (Sunday overtime)
RM75 (Public Holiday overtime)
per manhour
|
c. |
Failure to submit report or document required |
RM30.00 per operation |
d. |
Leaving place of work early and/or starting work late from the specified operations time. |
Same as failure to supply manpower above |
e. |
Wrong/Incomplete filling of documentation.
|
RM 30.00 per operation |
f. |
Late submission of documentation as required |
RM 30.00 per day |
This announcement is dated 7 December 2016.